Articles, news and notes from the field
What Sycon publishes between deployments: the technical background, the announcements, and what installations teach.
32 publications shown
ArticlePublished onStart with the bottleneck machine, not the whole plant
Lean hunts down waste, and unplanned downtime is the most expensive kind. What remains is choosing which machine to instrument first, and knowing what a measurement really lets you see coming.
ArticlePublished onWhat a technician sees once the algorithm has sorted the signal
Between a maintenance team that wants data and an IT department that protects its network, many projects stop before the first measurement. Here is what changes when the measurement bypasses the plant network.
ArticlePublished onA vibration reading means nothing without the motor's load
Databases full of points nobody opens, alerts people end up ignoring: the fault does not lie in the sensor, it lies in the missing context around the measurement.
ArticlePublished onFive energy levers, and the three that start with a measurement
Insulation, lighting, scheduling, upkeep, training: the levers have been known for years. What sets them apart is whether you can verify what they return.
ArticlePublished onWhat distorts the payback case for connected maintenance
The price of the sensors is almost never what sinks the case. It is the items that never appear on the quotation, and the time they consume before the first measurement.
ArticlePublished onGetting an old machine to talk without touching its mechanics
Replacing a line is one answer to unplanned downtime. It is neither the only one nor the first to examine while the installed equipment still does its job.